Skip to main content Scroll Top

Quality Assurance

Uncompromising Technical Standards

Quality Assurance

Precision Validated by Engineering

At Facilities Construction Services (FCS), Quality Assurance is not a final inspection—it is the foundation of our entire build process. In complex clinical environments, the margin for error is non-existent. Our QA protocols ensure that every RF shield, lead barrier, and structural anchor performs exactly as engineered, protecting your multi-million dollar imaging investments and the lives of those who operate them.

By integrating a licensed Professional Engineer (PE) into our daily operations, we provide a level of technical verification that traditional construction firms simply cannot match.

Quality Control Inspection

The FCS QA Framework

Shielding Integrity Testing

Comprehensive RF and lead attenuation testing conducted post-installation to ensure zero-leakage pathways before equipment commissioning.

OEM Spec Alignment

Rigorous adherence to Original Equipment Manufacturer (OEM) site requirements for MRI, CT, and Cath Lab modalities to ensure warranty compliance.

Structural Verification

PE-led load path analysis and anchor pull-testing to verify that ceiling-mounted rails and floor-loaded magnets are permanently secured.

Gas Pathway Audits

Non-destructive testing (NDT) and pressure-testing for cryogen vent systems to guarantee safe exhaust performance during a quench.

Material Certification

Strict chain-of-custody and certification reviews for all lead-lined materials and RF-grade copper to ensure raw quality matches project specs.

Zero-Impact Protocols

Continuous monitoring of HEPA filtration and dust containment barriers to protect air quality in active clinical environments.

PE-Driven Validation

Quality in medical construction is measured in millimeters and decibels. Our Professional Engineer provides the structural and technical oversight necessary to validate complex medical buildouts. This includes signing off on critical rigging paths and overseeing the final "as-built" documentation for AHCA submission.

We don't just build to code; we build to the highest engineering standard, ensuring your facility's long-term operational health and safety.

QA Deliverables:

  • • Final Shielding Survey Reports
  • • PE-Signed Structural Verifications
  • • OEM Compliance Sign-offs
  • • Complete AHCA Documentation Sets
100%Testing Pass Rate
PELead Oversight
ZeroDefect Strategy
OEMCertified Specs